Lakeland Village Campus Chiller Replacement

DESCRIPTION: Lakeland Village is a state operated 24-hour facility with 52 buildings that provides all facets of training, education and health care for about 250 individuals with developmental disabilities. Lakeland Village is federally certified for 60 Nursing Facility (NF) beds and 190 Intermediate Care Facility/Mental Retardation (ICF/MR) beds.

This energy-saving project involves replacing the two existing 225 ton campus chillers with two 300 ton units. Additionally outdated chilled water supply and return pumps were replaced along with the exterior cooling towers. Electrical work included replacement of the existing service entrance switchgear, modification of the existing motor control centers to include new VFD’s and harmonic filtering.

LOCATION: Medical Lake, Washington
CLIENT: Department of Social and Health Services
DELIVERY METHOD: ESCO
PRIME CONSULTANT: Apollo Solutions Group – Spokane, Washington
SERVICES PROVIDED: Electrical Consulting

LOCATION: Medical Lake, Washington

CLIENT: Department of Social and Health Services

DELIVERY METHOD: ESCO

PRIME CONSULTANT: Apollo Solutions Group Spokane, Washington

SERVICES PROVIDED: Electrical Consulting

DESCRIPTION:Lakeland Village is a state operated 24-hour facility with 52 buildings that provides all facets of training, education and health care for about 250 individuals with developmental disabilities. Lakeland Village is federally certified for 60 Nursing Facility (NF) beds and 190 Intermediate Care Facility/Mental Retardation (ICF/MR) beds.

This energy-saving project involves replacing the two existing 225 ton campus chillers with two 300 ton units. Additionally outdated chilled water supply and return pumps were replaced along with the exterior cooling towers. Electrical work included replacement of the existing service entrance switchgear, modification of the existing motor control centers to include new VFD’s and harmonic filtering.