Mann-Grandstaff VA Medical Center, Endoscopy Addition

DESCRIPTION: This project includes additions of the Endoscopy and the Supply, Processing and Distribution (SPD) areas. Both additions are second floor additions to existing structures, and include renovations where intertied to the existing second floor structure.

The Endoscopy addition includes exam rooms, four (4) procedure rooms, pre and post-op bays, scope/equipment storage, clean and soiled utility rooms, waiting and reception areas.

The SPD addition includes lab offices, equipment storage, scope cleaning, cart washing, prep and sterilization rooms, prep/sterilization storage, decontamination rooms, sterilizers, a walk-in lab cooler, lab storage, and a service elevator.

LOCATION: Spokane, Washington
FACILITY SIZE: 20,100 Square Feet
CLIENT: U.S. Department of Veteran’s Affairs
DELIVERY METHOD: Design-Bid-Build (DBB)
ARCHITECT: NAC|Architecture – Spokane, Washington
SERVICES PROVIDED: Electrical System Design