Deaconess Medical Center Chiller Plant

DESCRIPTION: Electrical design consisted of support for the replacement of two chillers, associated chilled water pumps, variable frequency drives, and miscellaneous equipment. Electrical design included re-configuration of the chiller room switchboard and replacement of an existing motor control center. Due to phasing requirements, a temporary chiller was connected to the hospital electrical systems while the chiller plant was being replaced.

LOCATION: Spokane, Washington
CLIENT: Deaconess Medical Center
DELIVERY METHOD: ESCO
PRIME CONSULTANT: Johnson Controls – Spokane, Washington
SERVICES PROVIDED: Electrical Consulting