Granger School District ESCO Phase I

DESCRIPTION:
Granger Middle School design work included reconfiguration of the electrical service entrance equipment, and additions to the main service for the following HVAC modifications in this 46,700sf building:

  • Boiler and Pump Retrofit. Replacement of the boilers and hot water pumps.
  • Chiller and Pump Retrofit. Replacement of the chiller and chilled water pumps.
  • HVAC Retrofit. Replacement of the fan coil units and air handling units.

Roosevelt Elementary School electrical design work included reconfiguration of the electrical service entrance equipment and additions to the main service for the following HVAC modifications for this 48,000sf building:

  • Boiler and Pump Retrofit. Replacement of the boilers and hot water pumps.
  • Chiller and Pump Retrofit. Replacement of the chiller and chilled water pumps.

LOCATION: Granger, Washington
CLIENT: Granger School District
DELIVERY METHOD: Design-Build (DB)
CONTRACTOR: Apollo Solutions Group – Spokane, Washington
SERVICES PROVIDED: Electrical System Design