William O. Douglas Federal Courthouse

William O. Douglas Federal Courthouse

DESCRIPTION: The William O. Douglas Federal Building was built in 1912 and is listed on the National Historic Register. This building is an excellent example of Second Renaissance Revival architecture, a classically inspired and dignified style that conveyed the stability of the federal government.

This project included design of a fire alarm system replacement within the building which still operates as a federal courthouse and includes a branch of the US Marshals. Specific courtrooms are architecturally sensitive and required detailed requirements for device placement. Design challenges included device placement and conduit concealment around many of the historic architectural features, including the many beamed and coffered ceilings of the main courtrooms hallways. Additional requirements included providing interface and auxiliary voice command center locations within the US Marshal’s office to allow for supplemental notification and control during emergency situations.

LOCATION: Yakima, Washington
FACILITY SIZE: 60,000 Square Feet
CLIENT: General Services Administration
DELIVERY METHOD: Design-Bid-Build (DBB)
ARCHITECT: Bernardo Wills Architects – Spokane, Washington
SERVICES PROVIDED: Electrical and Electronics System Design

Lakeland Village Campus Nurse Call Replacement

Lakeland Village Campus Nurse Call Replacement

DESCRIPTION: :akeland Village is a state operated 24-hour facility that provides all facets of training, education and health care for about 250 individuals with developmental disabilities.

Lakeland Village is federally certified for 60 Nursing Facility (NF) beds and 190 Intermediate Care Facility/Mental Retardation (ICF/MR) beds.

This project included design of nurse call systems for the South Campus licensed facilities, along with central reporting of each building’s systems. Project design included modifications to the existing campus fiber optic network.

LOCATION: Medical Lake, Washington
FACILITY SIZE: 12 Campus Buildings
CLIENT: Washington State DSHS
DELIVERY METHOD: Design-Bid-Build
ARCHITECT: DeNeff Deeble Barton Associates – Spokane, Washington
SERVICES PROVIDED: Electrical and Electronics System Design

Eastern State Hospital, FSU Security System Improvements

Eastern State Hospital, FSU Security System Improvements

DESCRIPTION: This project started as a study to provide options for the replacement of the existing low voltage security electronics systems within the Forensic Services Unit of the Eastlake Building. The study and report identified current available technologies, and provided a cost implementation plan to develop the project for funding in the next biennium State funding cycle.

After funding was secured, design documents were prepared, and construction administration services provided for remodeling of the existing systems to provide new low voltage security electronics systems, including the following:

  • Door control systems.
  • CCTV systems.
  • Intercom and Paging systems.
  • Access control systems.
  • Network infrastructure.
  • UPS Systems.

LOCATION: Medical Lake, Washington
FACILITY SIZE: 76,700 Square Feet, 105 Beds
CLIENT: Washington State DSHS
DELIVERY METHOD: Design-Bid-Build
ARCHITECT: NAC|Architecture – Spokane, Washington
SECURITY ELECTRONICS CONTRACTOR: Engineered Control Systems/Cornerstone Detention – Spokane, Washington
SERVICES PROVIDED: Electrical and Security Electronics System Design

Eastern State Hospital, Westlake Building

Eastern State Hospital, Westlake Building

LOCATION: Medical Lake, Washington
FACILITY SIZE: 145,000 Square Feet
CLIENT: Washington State, Department of Social and Health Services
DELIVERY METHOD: Design-Build (DB) and Design-Bid-Build (DBB)
ARCHITECT: DeNeff Deeble Barton Associates – Spokane, Washington
CONTRACTOR: Power City Electric – Spokane, Washington
SERVICES PROVIDED: Electrical System and Electronics Design

DESCRIPTION: Design of multiple projects for the Eastern State Hospital campus, with multiple projects within the Westlake Building. The major projects for the Westlake Building include:

  • Fire Alarm and Nurse Call Systems Replacement.
  • Generator Replacement.
  • Building Lighting Upgrades.

The Fire Alarm and Nurse Call Replacement project included the removal and replacement of both the fire alarm and nurse call systems within the existing secure psychiatric hospital. Elevator recall and electrical systems where modified to provide necessary code required interfaces to the fire alarm system. This project also included revising the network of the existing fire alarm control system on the Eastern State Hospital campus so that the new fire alarm system could connect to the campus network.

The Generator Replacement project removed and replaced the existing 25 year old 500kW diesel fueled generator.

The Building Lighting Upgrade project included the replacement of both the existing lighting systems in all five (5) patient wards and selected areas within the remainder of the rest of the psychiatric hospital. Moreover, patient room lighting systems were upgraded to include overbed fixtures for nighttime use; ward dayroom lighting controls were added for energy efficiency; and occupancy sensors were added to office and conference rooms.

San Mateo County Maple Street Correctional Facility

San Mateo County Maple Street Correctional Facility

DESCRIPTION: The San Mateo Jail Planning Committee has selected PCI, in conjunction with CML RW Security and Cache Valley Electric as low voltage security electronics designers and contractors for the San Mateo County Replacement Jail in Redwood City, California.  The architectural design of this facility is being designed by the HO+K San Francisco office.  The CMAR project will be delivered thru a joint venture between Sundt and Layton Construction. BIM modeling was provided, LEED Silver. Design included the following systems:

  • Cell and movement door control systems.
  • CCTV system.
  • Digital audio systems, including PDA communications interface.
  • Access control systems.
  • Network infrastructure
  • UPS Systems.

LOCATION: Redwood City, California
FACILITY SIZE: 260,000 Square Feet, 832 Beds
CLIENT: San Mateo County Sheriff
DELIVERY METHOD: Design-Build (DB)
ARCHITECT:
HO+K, Inc. – San Francisco, California
CGL Companies – Sacramento, California
SECURITY ELECTRONICS CONTRACTOR: CML Security – Erie, Colorado
SERVICES PROVIDED: Security Electronics System Design

Unitarian Universalist Church Solar Photovoltaic (PV) System

Unitarian Universalist Church Solar Photovoltaic (PV) System

DESCRIPTION: PCI was approached by the Chairman of the Church’s Solar Committee to discuss the design and construction of a large roof mounted Photovoltaic System (PV) to help the Church realize their renewable energy goals. The Solar Committee had been working with several other local engineers and contractors in the area to help build momentum for the project within the congregation. PCI was committed from the start to explore variations of system sizes and methods for maximizing the power production of the system while maintaining a competitive proposal which made the project financially feasible.

The Church had originally raised money to complete the solar array through donations made by members of the congregation but then soon realized that a partnership with Washington Based Non-Profit Sustainable Works would allow them access to financing options to increase the size of the solar array. Sustainable Works was able to secure additional financing for the project while taking on the role as the non-profit general contractor.

At the time, this installation represented the largest Church based photovoltaic (PV) solar array in Washington State.

This project consisted of adding 18.75kW of roof mounted solar photovoltaic panels. The installation included 75 SolarWorld 250W panels along with individual Enphase M215 micro inverters for each panel.

LOCATION: Spokane, Washington
SYSTEM SIZE: 18.75kW
CLIENT: Unitarian Universalist Church of Spokane
DELIVERY METHOD: Design-Build (DB)
CONTRACTOR: PCI Renewables – Spokane, Washington
SERVICES PROVIDED: Electrical System Design

Current production can be viewed below:

SCC Building 7 Renovation, Jenkins Wellness Center

SCC Building 7 Renovation, Jenkins Wellness Center

DESCRIPTION:

This project included remodel of the existing Science building to incorporate the following functions:

  • Radiology Technology and Biomedical Equipment Technicians.
  • Student Health and WellnessCenter.
  • Physical Education and Speech.
  • Computer Services Department.

The Computer Services Department remodel included a new data room to house the relocation of the campus servers.  The Radiology Technology included infrastructure for multiple imaging devices including X-Ray, MRI, and CT Scan devices. LEED Gold.

LOCATION: Spokane, Washington
FACILITY SIZE: 35,000 square feet
CLIENT: Community Colleges of Spokane
DELIVERY METHOD: Design-Bid-Build (DBB)
CONTRACTOR: Bouten Construction – Spokane, Washington
ARCHITECT: Deneff Deeble Barton – Spokane, Washington
SERVICES PROVIDED: Electrical System Design

Providence Holy Family Hospital, Surgery and Oncology Addition

Providence Holy Family Hospital, Surgery and Oncology Addition

DESCRIPTION: This project included a 42,000 square foot expansion of the surgery suites, new pre-operative and phase 2 post-operative facilities, and a remodel of the Oncology Department.  In addition, a new 4 story, 66,000 square foot medical office building was interconnected to the Oncology Expansion.

Electrical design included extension of existing normal and emergency power systems, extension of the existing fire alarm and nurse call systems, lighting, grounding, and provisions for future data/telephone, security, and CATV systems.

Modifications were made to the existing central plant equipment including addition of a new chiller and supporting equipment (cooling tower, VFD’s, chilled water pumps, and machine room emergency ventilation equipment); and modifications to the existing hot water heating systems including addition new pumping equipment and VFD’s.

Special design challenges included designing the Holy Family Catheterization Lab upgrade which utilized the same systems as the Surgery and Oncology Expansion as well as maintaining continuity of operations for the Catheterization Lab during the upgrade.

LOCATION: Spokane, Washington
FACILITY SIZE: 108,000 Square Feet
CLIENT: Providence Holy Family Hospital
DELIVERY METHOD: Design-Bid-Build (DBB)
CONTRACTOR: Bouten Construction – Spokane, Washington
ARCHITECT: NAC|Architecture
SERVICES PROVIDED: Electrical and Electronic System Design

Fire Station #4

Fire Station #4

DESCRIPTION: This station consisted of 4 apparatus bays, sleeping rooms for 8 individuals, a full service kitchen, workout/training room, separate alert, maintenance and decontamination centers, offices, library and a public conference area.

LOCATION: Spokane, Washington
FACILITY SIZE: 15,000 Square Feet
CLIENT: Spokane Fire Department
ARCHITECT: Denny Christensen & Associates – Spokane, Washington
DELIVERY METHOD: Design-Bid-Build (DBB)
SERVICES PROVIDED: Electrical System Design

Southern Nevada Women’s Correction Center

Southern Nevada Women’s Correction Center

DESCRIPTION: The project includes providing a 55,000 square foot addition on the existing 140,000 square foot facility. The addition contains 160 cells, single bed for housing and a secure medical wing with 12 additional beds. The existing perimeter fence was extended to include the new cellblocks.

The security electronics design includes design of a new, fully redundant touchscreen system for each new housing control room and the existing central control room, including database server within the low voltage electronics room. The touchscreen system was integrated to a programmable logic controller (PLC) for door controls, a digital audio intercom and paging system, a perimeter fence detection system and a CCTV system, with motion detection, that also included a network video recording (NVR) system. The new security electronics system was separated from the existing electronics system.

The existing PIR perimeter fence system was removed and as the perimeter fence was being extended, was replaced with a fence shaker detection system, extended to cover the entire perimeter. Along the new fence perimeter, a new CCTV system was provided.

Low voltage electronics rooms were designed with modular UPS systems connected to a generator backed source to ensure continuous security system operation.

LOCATION: Las Vegas, Nevada
FACILITY SIZE: 55,000 Square Feet, 172 Cells
CLIENT: Nevada Department of Corrections
DELIVERY METHOD: Design-Bid-Build (DBB)
ARCHITECT: KGA Architecture – Las Vegas, Nevada
SERVICES PROVIDED: Security Electronics System Design

Grant County PUD, Wanapum Maintenance Facility, Phase II

Grant County PUD, Wanapum Maintenance Facility, Phase II

DESCRIPTION: This project renovates the existing 62,400 square foot fabrication shop with new offices and a renovated shop space, which includes lathes, milling machines, rolling tables, a plasma and water jet cutter, band saws, hydraulic benders and presses, and two overhead cranes. A 12,000 square foot extension was added to the building for additional welding shop space which also includes relocation of the existing 30 ton crane.

Electrical design consisted of normal and emergency power systems, lighting, lighting control, equipment connection, grounding, data/telephone wiring, fire alarm, and security systems.

A separate storage building and fuel island were also part of the project design.

LOCATION: Beverly, Washington
FACILITY SIZE: 74,400 Square Feet
CLIENT: Grant County PUD
DELIVERY METHOD: Design-Bid-Build (DBB)
ARCHITECT: Bernardo Wills Architects – Spokane, Washington
SERVICES PROVIDED: Electrical System Design

California Health Care Facility

California Health Care Facility

DESCRIPTION: The California Health Care Facility Stockton is an intermediate-level medical and mental health care facility for inmate-patients within the California State prison system. This new facility is comprised of inmate-patient housing (1,722 Beds), diagnostic and treatment centers, a central utility plant, central kitchen, materials service center, and facility support areas to total 1.2 Million GSF.
The project includes developing bridging and criteria documents, work plans, and system layout for California Department of Corrections and Rehabilitation (CDCR) to delineate technologies to be used in a new 1,722 bed medical and mental health prison on the existing Stockton prison campus. LEED Silver.

AWARDS:
2014 – DBIA National Award of Excellence, Healthcare.
2014 – Silver Award, Building Design + Construction Magazine.
2014 – International Partnering Institute Award.
LEED Silver Certification

LOCATION: Stockton, California
FACILITY SIZE:
Bid Pack #1: 112,000 Square Feet
Bid Pack #2: 1,200,000 Square Feet
144 Acre Campus
1,722 Beds
CLIENT: California Department of Corrections and Rehabilitation
DELIVERY METHOD: Design-Build (DB)
ARCHITECT:
Lee, Burkhart, Liu, Inc. – Marina Del Rey, California
CGL Companies – Sacramento, California
Kitchell CEM – Sacramento, California
SECURITY ELECTRONICS CONTRACTOR: Metroplex Control Systems/ISI Security – San Antonio, Texas
SERVICES PROVIDED: Security Electronics System Design

Additional Renewable Energy Projects

Additional Renewable Energy Projects

Ground Mount Systems

City of Benton City, Wastewater Treatment Plant, Ground Mount Solar PV System, 75kW, Benton City, WA
City of Cheney, 102.7kW Ground Mount PV System, Cheney, WA
City of Colville, Wastewater Treatment Plant, Ground Mount Solar PV System, 100kW, Colville, WA
City of Colville, Well Pump, Ground Mount Solar PV System, 100kW, Colville, WA
City of Connell, 102.9kW Ground Mount PV System, Connell, WA
City of Granger, Well Pump, Ground Mount PV System, 52kW, Granger, WA
City of Kettle Falls Wastewater Treatment Plant Ground Mount Solar PV System, 100kW, Kettle Falls, WA
City of Mabton102.7kW Ground Mount PV System, Mabton, WA
City of Palouse, Ground Mount Solar PV System, 68kW, Palouse, WA
Eastern State Hospital, Boiler Plant Solar PV System, 22.4kW, Medical Lake, WA
Prescott School District, 102.9kW Ground Mount PV System, Prescott, WA
Relay Application Instruments, 15kW Ground Mount Photovoltaic System, Pullman, WA
Toppenish High School, Ground Mount Solar PV System, 100kW, Toppenish, WA
Town of Fairfield, Wastewater Treatment Plant, Ground Mount Solar PV System, 100kW, Fairfield, WA
Town of Friday Harbor, Wastewater Treatment Plant, Ground Mount Solar PV System, 100kW, Friday Harbor, WA
Town of St. John, Well Pump, Ground Mount Solar PV System, 100kW, St. John, WA
Vera Power, 6.72kW Ground Mount Photovoltaic System, Spokane, WA

Roof Top Systems

Anytime Fitness, 60kW Rooftop PV System, Pullman, WA
Blockhouse Perry, Rooftop PV System, 34.7kW, Spokane, WA
Central Washington University, Health Sciences Building, Rooftop PV System, 82.82kW, Ellensburg, WA
City of Malden, Community Center, Rooftop PV System, 42.5kW, Malden, WA.
City of Malden Town Hall, Rooftop Solar PV System, 51.7kw – Malden, WA
City of Pateros, 61.98kW Roof Mount PV System, Pateros, WA
City of Pullman, City Hall Rooftop PV System, 100kW, Pullman, WA
Genesee School, 50 kW Rooftop Solar PV System, Genesee, ID
Gonzaga Family Haven, 41 kW Rooftop Solar PV System, Spokane, WA
Haystack Heights 152 kW Co-Housing Community Rooftop PV System, Spokane, WA
Mother Teresa Haven, Rooftop PV System, Spokane, WA
Pasco Haven, Rooftop Solar PV System, 5.7kW, Pasco, WA
Siemer’s Rooftop Solar, 11.2 kW Rooftop PV System, Mead, WA
St. Luke’s Hospital, 4kW Rooftop PV System, Spokane, WA
Unitarian Universalist Church, 19kW Rooftop PV System, Spokane, WA
University of Idaho, IRIC Building, Rooftop PV System, 147kW, Moscow, ID
VA Medical Center, Rooftop Solar PV System, 30kW, Boise, ID
Washington State University, RTP2 Building, 30kW Rooftop PV System, 68kW Ground Mount System, Pullman, WA

Additional Healthcare Projects

Additional Healthcare Projects

HOSPITALS:

Benewah Community Hospital, St. Maries, ID
Bonner General Health, Sandpoint, ID

Essential Electrical System Replacement
RTAC-1 Replacement
MRI Replacement
Autoclave Replacement

Columbia Basin Hospital, ESCO, Ephrata, WA
Confluence Health, Central Parking Garage, Wenatchee, WA

Deaconess Medical Center, Spokane, WA.

1st Floor HEC Building, Cancer Care Northwest – PET Suite Build-Out
7th Floor HEC Building, Rockwood Oncology
1st Floor Main Building, Outpatient Pharmacy Remodel
1st Floor Main Building, Sleep Disorder Lab Remodel
1st Floor Main Building, Tray Line Remodel
4th Floor Patient Tower, Cath Lab Remodel
4th Floor Patient Tower, Vascular Lab Remodel
5th Floor Doctor’s Office Building, Spokane Urology Remodel
6th Floor Main Building, Administrative Services Remodel
6th Floor, Lab and Central Services Relocation Study
Chiller Plant Upgrade
Urology Suite Renovation

Deer Park Hospital, Deer Park, WA

CT Scan Addition
Physical Therapy Renovations

East Adams Rural Hospital, Ritzville, WA

Emergency Power System Remodel
Life Safety Upgrades
Hospital Renovation/Addition

Ferry County Memorial Hospital, Republic, WA

Essential Electrical System Study, Phase I
MRI Replacement
CT Addition
Humidifier Replacement
Essential Electrical System Study, Phase II
Chiller Replacement
Essential Electrical System Replacement, Phase I

Grande Ronde Hospital, Grande Ronde, OR

Central Plant and Emergency Power Study
New Chiller Plant

Providence Holy Family Hospital, Spokane, WA

Automatic Transfer Switch Replacement
Anti-Coagulation Clinic Renovation
Boiler Room Renovations
Catheter Lab Remodel, OR#11 Remodel
Central Parking Lot
Critical Switchboard Replacement
Electrical System Study, Phase I
Emergency Power System Replacement Study
Emergency Power System Deficiency Corrections
Essential Electrical System Corrections
JCAHO Documentation
Heart Clinic’s Northwest Tenant Improvement
Human Resources Remodel
ICU Remodel
Maternity Remodel
Master Planning
MOB Tenant Improvements, North Spokane Pulmonary
MOB Tenant Improvements, Micro Neurosurgery and Spine
PMG Ortho Tenant Improvements
Providence Physician Services
Physical Therapy Remodel
Linear Accelerator and Simulator OBI Additions
Speech Pathology Renovation
Surgery and Oncology Expansion, Medical Office Building Addition

Lincoln Hospital, Emergency Department Remodel, Davenport, WA
Sacred Heart Medical Center, Spokane, WA

Arthritis NW Suite Remodel
Arthritis Northwest TI Remodel
Acute Care Unit Remodel
Catheter Holding Remodel
Heart Clinics Northwest Remodel
Heart Clinics Northwest Remodel, Phase II
Kootenai Heart Clinics Northwest TI Remodel
Heart & Lung Northwest Remodel
Inland Neurosurgery MRI Suite Remodel
Inland Vascular Institute Tenant Improvement
Inland Imaging PET CT Addition
Northwest Heart and Lung Tenant Improvement
PHVI Nuclear Medicine
Providence Care Center Remodel
Psychiatric Unit Remodel
Rockwood Clinic Remodel
Spokane Dermatology Remodel
Spokane Digestive Disease Center Remodel
Spokane OB/GYN Remodel
Surgery Specialists of Spokane Remodel

Veteran’s Affairs Medical Center, Spokane, WA

3rd Floor North Remodel
BioMed HVAC Upgrades
Canteen Remodel
Electrical Systems As-Builting
Endoscopy and Central Processing Addition
Laundry Expansion
Mental Health Expansion

Whitman Community Hospital, Colfax, WA

CONTINUING AND RESIDENTIAL CARE FACILITIES:

Bethany Place Addition, Spokane, WA
Extendicare, Spokane, WA

North Auburn Rehabilitation Center
Franklin Hills Rehabilitation Center

Harbor Crest Convalescent Center, Spokane, WA.
Lakeland Village, Medical Lake, WA.

Cottage Renovations, Phase III, Medical Lake, WA.
Cottage Renovations, Phase IV, Medical Lake, WA.
Cottage Renovations, Phase V, Medical Lake, WA.
Campus Chiller Replacement, Medical Lake, WA.
Campus Emergency Power System Study, Medical Lake, WA
ESCO Project, Medical Lake, WA.
Campus Nurse Call System Study, Medical Lake, WA.
Campus Nurse Call System Replacement, Medical Lake, WA.
Cottage Fire Alarm and Fire Sprinkler Renovations, Medical Lake, WA.
Exterior Lighting Remodel, Medical Lake, WA.
Food Service HVAC Replacement, Medical Lake, WA.
Food Service Primary Transformer Replacement, Medical Lake, WA.
Laundry Electrical Renovations
Laundry Electrical Study
Laundry Mechanical Renovations
PAT/HAB Center HVAC Upgrades

Life Care Centers, Emergency Power System Upgrade, Ritzville, WA.
Luther Park Assisted Living Facility, Sandpoint, ID.
Magic Valley Manor, Nursing Home Expansion, Twin Falls, ID.
McKay Healthcare, Emergency Power System Replacement, Soap Lake, WA.
Spokane Veterans’ Home, Spokane, WA.
WA State Department of Health and Human Services, Medical Lake Campus Master Planning, Medical Lake, WA.
Yakima Valley School, Primary Switch Replacement, Selah, WA.

MENTAL HEALTH FACILITIES:

Alaska Psychiatric Hospital, Anchorage, AK.
California Department of Corrections and Rehabilitation(CDCR), CA

California Health Care Facility, CDCR 1722 Bed Mental and Medical Health Prison, Stockton, CA
CA Prison Receivership, Mental and Medical Health Facilities, Statewide, CA
DeWitt Nelson Conversion, Mental Health Prison, Stockton, CA

Eastern State Hospital, Medical Lake, WA

Activity Therapy and Therapy Pool, Fire Alarm Upgrade
Administration Building Elevator Replacement
Campus Mechanical Upgrades
Campus Architectural Services
Electrical Room Repairs
Eastlake Building, APU Lighting Replacement
Eastlake Building, Duress Alarm System
Eastlake Building North Fire Alarm Improvements
Eastlake Building Forensic Services Unit Security Study
Eastlake Building Forensic Services 2N3 Unit Expansion
Eastlake Building Forensic Services Unit Security System Replacement
Eastlake Building Patient Safety Improvements
Eastlake Building Psychiatric Intensive Care Unit
ISSD Telecom Support
Omnibus Projects
Single Mode Fiber Interconnect
Therapy Pool, Electrical Service Replacement
Sewage Lift Station Repair
Well Pumping Station.
Westlake Building, DA Tank Replacement
Westlake Building, Evacuation Phase I
Westlake Building, Evacuation Phase II
Westlake Building, Fire Alarm and Nurse Call System Replacement
Westlake Building, Generator Replacement
Westlake Building, Lighting Upgrades
Westlake Building, Nurse Call System Replacement
Westlake Building, PBX Upgrades
Westlake Building, Security Door Replacement
Westlake Building, Renovation Phase I
Westlake Building, Renovation Phase II

Grant County Mental Health, Psychiatric Boarding Home, Moses Lake, WA.
Spokane County, Mental Health Facility Remodel, Spokane, WA.
University of Washington, Behavioral Health Teaching Facility, Seattle, WA.

IMAGING SYSTEMS:

Benewah Community Hospital, St. Maries, ID.
Bonner General Health, CT Scan and MRI Replacement, Sandpoint, ID.
Boundary Regional Community Health Center, Bonners Ferry, ID.
CA Health Care Facility, 1722 Bed Mental and Medical Health Prison, Stockton, CA.
Clearwater Valley Medical Clinic, Orofino, ID
Deaconess Medical Center, 1st Floor HEC Building, Cancer Care Northwest – PET Suite Build-Out, Spokane, WA.
Deaconess Medical Center, 4th Floor Patient Tower, Cath Lab Remodel, Spokane, WA.
Deaconess Medical Center, 4th Floor Patient Tower, Vascular Lab Remodel, Spokane, WA.
Deer Park Hospital, CT Scan Addition, Deer Park, WA.
East Adams Rural Hospital, CT Scan, Mobile MRI, X-Ray, Ritzville, WA.
Ferry County Memorial Hospital, MRI Replacement, Republic, WA.
Ferry County Memorial Hospital, CT Scan Addition, Republic, WA.
Heart Clinic Northwest Imaging Equipment Addition, Spokane, WA.
Holy Family Hospital, Cath Lab Remodel, OR#11 Remodel, Spokane, WA.
Holy Family Hospital, Inland Vascular Improvement, Spokane, WA.
Holy Family Hospital, Simulator and OBI Additions, Spokane, WA.
Inland Imaging, CT Scan Remodel, Valley Facility, Spokane, WA.
Inland Imaging, MRI Suite Remodel, Valley Facility, Spokane, WA.
Inland Imaging, Ultrasound Suite Remodel, Spokane, WA.
Mattawa Medical Clinic, Mattawa, WA.
Pacific Medical Center, Beacon Hill, Imaging Suite Additions, Seattle, WA.
Sacred Heart Medical Center, Cath Holding Remodel, Spokane, WA.
Sacred Heart Medical Center, Heart & Lung Northwest Remodel, Spokane, WA.
Sacred Heart Medical Center, Inland Neurosurgery MRI Suite Remodel, Spokane, WA.
Sacred Heart Medical Center, Inland Imaging PET CT Addition, Spokane, WA.
Sacred Heart Medical Center, Northwest Heart and Lung Tenant Improvement, Spokane, WA.
Sacred Heart Medical Center, PHVI Nuclear Medicine, Spokane, WA.
Spokane Community College, Building 7 Remodel, Spokane, WA

MEDICAL AND DENTAL CLINICS:

Advanced Dermatology, Coeur d’Alene, ID
Advanced Performance and Rehabilitation, Physical Therapy Facility, Bozeman, MT
Boundary Regional Community Health Center, Bonners Ferry, ID
Christ Care Clinic, Spokane, WA
Clearwater Valley Medical Clinic, Orofino, ID
Columbia Valley Community Health, Facility Addition and Renovation, Chelan, WA
Ear Nose Throat Medical Office Building, Spokane, WA
Heart Clinic Northwest Imaging Equipment Addition, Spokane, WA
Issaquah Plastic Surgery Center, Issaquah, WA
Mattawa Medical Clinic, Mattawa, WA
Northwest Dermatology, spokane, WA
Palouse Oral Surgery, Facility Renovation, Lewiston, ID
Pacific Medical Center, Seattle, WA
Spokane Cardiology, Tenant Improvement, Spokane, WA
Spokane Urology, Spokane, WA
Yakima Valley Farm Worker’s Clinic, Dental Expansion, Grandview, Wa

Additional Detention Projects

Additional Detention Projects

PRISONS:

California Department of Corrections and Rehabilitation:
California Prison Receivership, CDCR Mental and Medical Health Facilities, Statewide, CA
California Health Care Facility, CDCR 1722 Bed Mental and Medical Health Prison, Stockton, CA
California Medical Facility, CDCR Health Care Facility Improvement Project, Vacaville, CA
California State Prison – Solano, Health Care Facility Improvement Project, Vacaville, CA
Deuel Vocational Institute, Health Care Facility Improvement Project, Vacaville, CA
DeWitt Nelson Conversion, Mental Health Prison, Stockton, CA
Prison Master Planning, Statewide, CA

Hawaii Department of Corrections:
Halawa Correctional Facility, Mental and Medical Health Facility, Aiea, HI
Women’s Community Correctional Center, Kailua, HI

Nevada Department of Corrections:
Nevada Department of Corrections, High Desert State Prison, Prison 8, Perimeter Security System, Indian Springs, NV
Nevada Department of Corrections, Southern Nevada Women’s Correctional Center, Las Vegas, NV

South Dakota Department of Corrections:
1500 Bed Men’s Prison, Harrisburg, SD
300 Bed Women’s Prison, Rapid City, SD

Washington Department of Corrections:
Washington Corrections Center, Building R, Shelton, WA
Washington Corrections Center for Women, Security Video System Improvements, Gig Harbor, WA
Washington Corrections Center for Women, Special Needs Unit, Gig Harbor, WA
Washington Corrections Center for Women, Building E, Gig Harbor, WA
Washington Corrections Center for Women, Building A Transformer Replacement, Gig Harbor, WA
Washington Corrections Center for Women, Building D Switchboard Replacement, Gig Harbor, WA
Washington State Penitentiary, West Complex Security Electronics Replacement, Walla Walla, WA

JUVENILE FACILITIES:

Colorado Department of Human Services, Denver, CO

Grand Mesa Youth Services Center, Grand Mesa, CO
Lookout Mountain Youth Service Center, Golden, CO
Mount View Youth Services Center, Lakewood, CO
Pueblo Youth Services Facility, Pueblo, CO
Zebulon Pike Youth Service Center, Colorado Springs, CO

Humboldt County Juvenile Detention Facility, Eureka, CA
Oregon Youth Authority, Multiple Projects, Statewide, OR

Oregon Youth Authority, Hillcrest Youth Correctional Facility, Zeta Hall Remodel, Salem, OR
Oregon Youth Authority, McLaren Youth Correctional Facility, Critical Incident Unit, Hubbard, OR
Oregon Youth Authority, Oak Creek Youth Correctional Facility, Transitional Building, Albany, OR

Santa Cruz County Juvenile Center, Santa Cruz, CA
Yamhill County Juvenile Detention Facility, Remodel, McMinnville, OR
Yolo County Juvenile Detention Facility, Woodland, CA

JAILS:

Ada County Jail, Boise, ID
Butte County Jail, Oroville, CA
Chehalis Public Safety Building, Chehalis, WA
Delta County Jail, Security Electronics Replacement, Delta, CO
Humboldt County Re-Entry Facility, Eureka, CA
Imperial County Jail, El Centro, CA

Herbert Hughes Correctional Center, Security Electronics Study, El Centro, CA
Regional Adult Detention Facility, Security Electronics Study, El Centro, CA

Los Angeles County Jail, Los Angeles, CA

Century Regional Detention Facility, Security Electronics Study, Los Angeles, CA
Pritchess Detention Center, Security Electronics Study, Los Angeles, CA

Madera County Jail, Madera, CA
Okanogan County Jail, Okanogan, WA
Pierce County Jail, Security Electronics, Tacoma, WA
Santa Barbara County, North Branch Jail – Santa Maria, CA
San Bernardino County, Glen Helen Rehabilitation Center, Devore, CA
San Diego County Women’s Correctional Facility, Santee, CA
San Mateo County Maple Street Correctional Facility – Redwood City, CA
Santa Cruz Jail, Rountree Facility – Santa Cruz, CA
Santa Ana City Jail, Santa Ana, CA
Santa Rita Jail, Dublin, CA
Shasta County

Shasta County Adult Detention Facility – Redding, CA
Shasta County Main Jail, Redding, CA

Sonoma County Main Adult Detention Facility, Camera Additions, Santa Rosa, CA
Spokane County Jail, Spokane, WA
Sunnyside Law and Justice Center – Sunnyside, WA
Stevens County Public Safety Facility, Colville, WA
Tehama County Jail, Redwood City, CA
Wahkiakum County Jail, Cathlamet, WA
Yamhill County Jail, McMinnville, OR

MENTAL HEALTH FACILITIES:

California Department of Corrections and Rehabilitation(CDCR), CA

California Health Care Facility, CDCR 1722 Bed Mental and Medical Health Prison, Stockton, CA
DeWitt Nelson Conversion, Mental Health Prison, Stockton, CA

Eastern State Hospital, Medical Lake, WA

Security Electronics Replacement
Forensic Services Unit Expansion
Psychiatric Intensive Care Unit Expansion

University of Washington, Seattle, WA

Behavioral Health Teaching Facility – Seattle, WA

Page 5 of 512345