Prescott School District Ground Mount Solar PV System
DESCRIPTION:
This project was a design/build system for a 102.9 kW-DC ground mount solar PV array located at Prescott High School. The system consists of Silfab Solar modules, Solar Edge power optimizers, Solar Edge three phase inverters, and Unirac ground fixed tilt racking.
This solar installation is estimated to produce more than 151,665 kWh/year annually saving Prescott School District more than $10,570 per year. This is equivalent to 109.5 metric tons of CO2 greenhouse gases saved annually.
LOCATION: Prescott, Washington
CLIENT: Prescott School District
DELIVERY METHOD: Design-Build (DB)
CONTRACTOR: PCI Renewables – Spokane, Washington
SERVICES PROVIDED: Electrical System Design