Deaconess Medical Center Chiller Plant

Deaconess Medical Center Chiller Plant

DESCRIPTION: Electrical design consisted of support for the replacement of two chillers, associated chilled water pumps, variable frequency drives, and miscellaneous equipment. Electrical design included re-configuration of the chiller room switchboard and replacement of an existing motor control center. Due to phasing requirements, a temporary chiller was connected to the hospital electrical systems while the chiller plant was being replaced.

LOCATION: Spokane, Washington
CLIENT: Deaconess Medical Center
DELIVERY METHOD: ESCO
PRIME CONSULTANT: Johnson Controls – Spokane, Washington
SERVICES PROVIDED: Electrical Consulting

Genesee School Rooftop Solar Photovoltaics (PV) Addition

Genesee School Rooftop Solar Photovoltaics (PV) Addition

DESCRIPTION: This project includes addition of a 48kW rooftop solar photovoltaics system divided into a north and south array. Design included layout of photovoltaic modules, combiner boxes, inverter, grounding systems, disconnects, AC and DC feeder voltage drop calculations, and intertie into the existing normal power systems.

Design also included interface with the serving utility for net metering.

LOCATION: Genesee, Idaho
CLIENT: Genesee Joint School District #282
DELIVERY METHOD: Design-Build (DB)
CONTRACTOR: Power City Electric – Spokane, Washington
SERVICES PROVIDED: Electrical System Design

San Mateo County Maple Street Correctional Facility

San Mateo County Maple Street Correctional Facility

DESCRIPTION: The San Mateo Jail Planning Committee has selected PCI, in conjunction with CML RW Security and Cache Valley Electric as low voltage security electronics designers and contractors for the San Mateo County Replacement Jail in Redwood City, California.  The architectural design of this facility is being designed by the HO+K San Francisco office.  The CMAR project will be delivered thru a joint venture between Sundt and Layton Construction. BIM modeling was provided, LEED Silver. Design included the following systems:

  • Cell and movement door control systems.
  • CCTV system.
  • Digital audio systems, including PDA communications interface.
  • Access control systems.
  • Network infrastructure
  • UPS Systems.

LOCATION: Redwood City, California
FACILITY SIZE: 260,000 Square Feet, 832 Beds
CLIENT: San Mateo County Sheriff
DELIVERY METHOD: Design-Build (DB)
ARCHITECT:
HO+K, Inc. – San Francisco, California
CGL Companies – Sacramento, California
SECURITY ELECTRONICS CONTRACTOR: CML Security – Erie, Colorado
SERVICES PROVIDED: Security Electronics System Design

Unitarian Universalist Church Solar Photovoltaic (PV) System

Unitarian Universalist Church Solar Photovoltaic (PV) System

DESCRIPTION: PCI was approached by the Chairman of the Church’s Solar Committee to discuss the design and construction of a large roof mounted Photovoltaic System (PV) to help the Church realize their renewable energy goals. The Solar Committee had been working with several other local engineers and contractors in the area to help build momentum for the project within the congregation. PCI was committed from the start to explore variations of system sizes and methods for maximizing the power production of the system while maintaining a competitive proposal which made the project financially feasible.

The Church had originally raised money to complete the solar array through donations made by members of the congregation but then soon realized that a partnership with Washington Based Non-Profit Sustainable Works would allow them access to financing options to increase the size of the solar array. Sustainable Works was able to secure additional financing for the project while taking on the role as the non-profit general contractor.

At the time, this installation represented the largest Church based photovoltaic (PV) solar array in Washington State.

This project consisted of adding 18.75kW of roof mounted solar photovoltaic panels. The installation included 75 SolarWorld 250W panels along with individual Enphase M215 micro inverters for each panel.

LOCATION: Spokane, Washington
SYSTEM SIZE: 18.75kW
CLIENT: Unitarian Universalist Church of Spokane
DELIVERY METHOD: Design-Build (DB)
CONTRACTOR: PCI Renewables – Spokane, Washington
SERVICES PROVIDED: Electrical System Design

Current production can be viewed below:

California Health Care Facility

California Health Care Facility

DESCRIPTION: The California Health Care Facility Stockton is an intermediate-level medical and mental health care facility for inmate-patients within the California State prison system. This new facility is comprised of inmate-patient housing (1,722 Beds), diagnostic and treatment centers, a central utility plant, central kitchen, materials service center, and facility support areas to total 1.2 Million GSF.
The project includes developing bridging and criteria documents, work plans, and system layout for California Department of Corrections and Rehabilitation (CDCR) to delineate technologies to be used in a new 1,722 bed medical and mental health prison on the existing Stockton prison campus. LEED Silver.

AWARDS:
2014 – DBIA National Award of Excellence, Healthcare.
2014 – Silver Award, Building Design + Construction Magazine.
2014 – International Partnering Institute Award.
LEED Silver Certification

LOCATION: Stockton, California
FACILITY SIZE:
Bid Pack #1: 112,000 Square Feet
Bid Pack #2: 1,200,000 Square Feet
144 Acre Campus
1,722 Beds
CLIENT: California Department of Corrections and Rehabilitation
DELIVERY METHOD: Design-Build (DB)
ARCHITECT:
Lee, Burkhart, Liu, Inc. – Marina Del Rey, California
CGL Companies – Sacramento, California
Kitchell CEM – Sacramento, California
SECURITY ELECTRONICS CONTRACTOR: Metroplex Control Systems/ISI Security – San Antonio, Texas
SERVICES PROVIDED: Security Electronics System Design

Page 2 of 212